Last reviewed:

General information, not legal or tax advice.

Identify the federal and state coverage questions

DOL describes Davis-Bacon coverage for federally funded or assisted construction contracts exceeding $2,000. DIR states California’s general prevailing wage threshold as projects over $1,000. These thresholds address different systems; neither alone establishes the entire reporting workflow for a specific contract.

Check who awards and controls the work

DIR says California prevailing wage requirements do not apply to work awarded by and under complete federal control. Federally funded or assisted projects controlled or carried out by California awarding bodies can be subject to California requirements. Preserve the contract clauses that establish the project’s treatment.

Compare the applicable wage determinations

Federal determinations are obtained through SAM.gov. Caltrans guidance for projects with federal funds calls for comparing federal and state rates and paying the higher applicable rate. Have the project reviewer identify the relevant classifications and provisions before loading rates into payroll.

Confirm reporting destinations instead of assuming both

WH-347 itself is optional, though covered federal payroll information is due weekly. DIR’s exemptions include Caltrans and other specified legacy labor compliance programs. Caltrans still requires weekly reports to Labor Compliance. The contract and applicable exemptions decide whether DIR eCPR is also needed; federal funding does not mean every job requires both.

Maintain a project reporting matrix

As a practical control, list each recipient, accepted format, cadence and responsible preparer in the job file. Keep the contract instruction next to each entry. Update the matrix when the awarding body supplies a correction, and retain submission evidence by recipient so the team can see what remains outstanding.

Sources: federal and California coverage

Organize the reporting your contract calls for

Tidwell helps prepare certified payroll using the project’s reviewed reporting instructions and wage information.

Discuss federal certified payroll
Call (805) 462-8608