San Jose Creek bridges on separate routes

The US 101 and SR 217 bridge projects have separate route references and construction estimates. A contractor should retain those distinctions in its timekeeping and billing files. Equipment shared between jobs needs a consistent allocation method so payroll and job-cost reports describe the work performed at each actual site.

  • US 101 San Jose Creek Bridge replacement (PM 21.6, City of Goleta). Amount recorded: $26,097,000 estimated construction. Source status (2023-2026): Construction scheduled 4/4/2023 to 7/3/2026. Agency: Caltrans District 5.
  • SR 217 San Jose Creek Bridge replacement (PM 0.9-1.4), with 10-ft bike/ped path. Amount recorded: $23,272,000 capital construction (2019 estimate). Source status (2023-2026): Construction scheduled March 2023 to July 2026. Agency: Caltrans District 5.

Mariposa Well and loan applications awaiting awards

A nearly completed well and applications for future loans belong in different stages of a utility planning file. Do not treat a funding-list placement as a final award. For work under contract, separate materials deposits from installation costs and review remaining commitments against the project's actual payment schedule.

  • Mariposa Well (district's second new well in 40+ years) and Net Zero renewable energy program (~2,555 solar panels, in-pipe hydroturbines). Amount recorded: $6 million (Net Zero Initiative). Source status (2026): Well nearing completion (Spring-Summer 2026). Agency: Goleta Water District.
  • Six projects in four State Revolving Fund loan applications. Amount recorded: $25 million in applications. Source status (2026-2027): All four on funding list; final awards expected spring 2027. Agency: Goleta Water District.

Elementary modernization and district boundaries

A Goleta Union bond is distinct from the highway and water-district projects above. Maintain the school district as its own customer record, with campus-level detail where the scope requires it. This gives the business a usable account of school work alongside its other construction commitments.

  • Goleta Union School District: Measure M (2020) passed. Bond amount: $80 million.

Distance and bookkeeping access

Goleta's population is 32,685 (ACS 2024). Census PEP records population change of -1.1% from 2020 to 2025; this uses a different Census series from the ACS count.

Goleta is about 86.1 miles from our Atascadero office, measured in a straight line. We work remotely, with meetings at our Atascadero office by arrangement.

Bridge identifiers and pending utility funds

Are the Goleta San Jose Creek bridge records one contract?

The source entries identify separate US 101 and SR 217 projects. Preserve the route and contract reference in timekeeping, supplier invoices and payment applications.

Does placement on the utility funding list mean the loan is final?

The cited record says final awards are expected later. Funding-list status should not be recorded as cash received or an executed construction agreement.